Eskom Transmission Ten-Year Development Plan 2013-2022

The publication looks at the transmission network and generation integration projects required to ensure that the network is adequate to evacuate and dispatch power from the source to the load centres (Eskom, 2013).

Type: Strategies and Guides
Size: 4.77Mb

Share this post