#Tshwane Ya Tima Presentation
The presentation done by the City of Tshwane on their #Tshwane Ya Tima
544KBDownloadThe presentation done by the City of Tshwane on their #Tshwane Ya Tima
544KBDownloadSALGA’s concluding declaration from the 2018 Energy Summit: Defining the Energy Future of
617KBDownloadSouth Africa’s latest integrated resource plan describes a rapid solar photovoltaic (PV) build
0.3MBDownloadThis document unpacks the future impacts of electric vehicles on the City of
2 MBDownloadThis report reviews municipal PPPs and identifies challenges inhibiting its uptake in South
2 MBDownloadThis Working Paper provides a summary of the current wheeling framework, key electricity
3 MBDownloadThis video of hope follows the journey of three municipalities that have embraced
N/ADownloadReport to be completed on decommissioning of an SSEG system (necessary before a municipality removes the customer from the SSEG tariff) (Feb, 2021).
0.18MbDownloadReport to be completed during the SSEG commissioning process, including checklists and sign-off by authorised personnel.
0.18MbDownloadSets out what the municipality requires in terms of SSEG to be connected to their networks, including what is and is not allowed, the standards and specifications to be complied with, and the application process to be followed. SSEG installers and prospective customers should familiarise themselves with this document prior to submitting applications (Feb, 2021).
1.3MbDownload